Stations entering into an agreement with the NHAB agree to have their station inspected within a period of 150 days from the signed date of the ABIP contract between the NHAB and the station operator. Once a station is found in compliance with all FCC regulations, the FCC will not conduct an inspection, investigation, or audit of the station for a period of 3 years from the date of the Certificate of Compliance issued to the station by the NHAB, notwithstanding the following:
1) “Targeted Tower Safety Inspection” (relative to tower safety issues and limited to the antenna site)
2) “Complaint Driven Inspection” (any complaint initiated against a station)|
3) Political broadcasting or EEO materials required to be in the station’s public inspection file.
Inspection Fees (per call letters):
Re-Inspection: $500
Click here for the ABIP application. For information contact Tracy Caruso at 603-867-0808.